Projects

CFL multimodal warehouse

2015 - 2016

Category

IndustrialCivil Engineering

A 30,000m2 warehouse for CFL Multimodal

As part of the construction of the multimodal terminal, CFL has entrusted Félix Giorgetti with the construction of a 30,000 m2 logistics hall.

This new tool has allowed CFL Multimodal to bring together all its logistics activities, taking advantage of the site's strategic location, in direct proximity to the international highway network, the intermodal terminal, the rail highway platform and the marshalling yard.

30,000m2

Bulding's surface

20m

Ridge height

400m2

Office's area

Very good

BREEAL certification

It also includes 400m2 of office space. In addition to the 13,000 pallets that can be stored in height, the building can accommodate 12,000 rolls, 50,000 tires, 1,500 pallets kept at +5°C or 450 pallets at -23°C.

The works required 100,000 t of 0/50 HF platform fill, 13,000m3 of cast-in-place concrete, 3,200m3 of prefabricated structure (columns and beams), 870m3 of prefabricated firewalls and 6,300m of prefabricated slabs in hourdis.

Our client

Project owner

CFL

Key figures

Storage of pallets in height

13,000

Loading docks

64 

Backfill platform in 0/50 HF

100,000t

Cast-in-place concrete

13,000m3

Prefabricated structure columns and beams

3,200m3

Prefabricated firewalls

870m3

Prefabricated slabs in hourdis

6,300m